Amersham, Buckinghamshire, UK. 11th January, 2021. A sign for No HS2 traffic. The number of HGVs going through villages in Buckinghamshire is vast. HS2 are carrying out utility works at the bottom of Gore Hill in Amersham on A355 and A413. One of five ventilation shafts for the new High Speed Rail is being built nearby where a tunnel for the train will go underneath the Chilterns. The controversial High Speed Rail from London to Birmingham is massively over budget. Credit: Maureen McLean/Alamy

Amersham, Buckinghamshire, UK. 11th January, 2021. A sign for No HS2 traffic. The number of HGVs going through villages in Buckinghamshire is vast. HS2 are carrying out utility works at the bottom of Gore Hill in Amersham on A355 and A413. One of five ventilation shafts for the new High Speed Rail is being built nearby where a tunnel for the train will go underneath the Chilterns. The controversial High Speed Rail from London to Birmingham is massively over budget. Credit: Maureen McLean/Alamy Stock Photo
Preview

Image details

Contributor:

Maureen McLean / Alamy Stock Photo

Image ID:

2E323AB

File size:

38.5 MB (1.4 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

4500 x 2994 px | 38.1 x 25.3 cm | 15 x 10 inches | 300dpi

Date taken:

11 January 2021

Location:

Amersham, Buckinghamshire, UK

More information:

This image could have imperfections as it’s either historical or reportage.