Aylesbury Vale, Buckinghamshire, UK. 29th April, 2021. HS2 have closed Rocky Road until 14th May 2021 for more work on the construction of the High Speed Rail from London to Birmingham. HS2 Security are stopping traffic and HS2 CCTV cameras are being used by HS2. HS2 have also closed a number of local footpaths including the bridleway from Rocky Lane to Durham Farm, however, none of the footpath closures are listed by Buckinghamshire Council on their website. Credit: Maureen McLean/Alamy
RFID:Image ID:2FMDWB8
Image details
Contributor:
Maureen McLean / Alamy Stock PhotoImage ID:
2FMDWB8File size:
38.5 MB (3.1 MB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
4500 x 2994 px | 38.1 x 25.3 cm | 15 x 10 inches | 300dpiDate taken:
29 April 2021Location:
Aylesbury Vale, Buckinghamshire, UKMore information:
This image could have imperfections as it’s either historical or reportage.