Construction site of tunnel under the River Rimac for a new motorway and Yellow Line Via Expresa bus route, Lima, Peru. The tunnel runs for 1.8km under the River Rimac, which was diverted to allow construction to take place. Works started in January 2012 and took 6 years, the tunnel opened in June 2018. The Brazilian company OAS built the tunnel.

Construction site of tunnel under the River Rimac for a new motorway and Yellow Line Via Expresa bus route, Lima, Peru. The tunnel runs for 1.8km under the River Rimac, which was diverted to allow construction to take place. Works started in January 2012 and took 6 years, the tunnel opened in June 2018. The Brazilian company OAS built the tunnel. Stock Photo
Preview

Image details

Contributor:

James Brunker / Alamy Stock Photo

Image ID:

2R20R6X

File size:

63.7 MB (1.9 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5781 x 3854 px | 48.9 x 32.6 cm | 19.3 x 12.8 inches | 300dpi

Date taken:

25 October 2015

Location:

Rimac / central Lima, Peru

More information:

This image could have imperfections as it’s either historical or reportage.

This image can't be licensed for personal use (e.g. personal prints).