. The Street railway journal . At 138th St. crossing of the N. Y.Central R. R. in N. Y. City, is a gate madeand erected by us 7 years ago. This gateis raised and lowered nearly ever minutein the day, yet it has never been out oforder in that time nor cost anythingfor repairs. WE BUILT COMPLETE, READYFOR OPERATION, THE CABLE ROADTHROUGH 125th STREET, FROMRIVER TO RIVER, IN NEW YORKCITY. Pivotal Elevating Mechanism at 125th St. and Third Ave., N. Y. We also built a portion of the SpecialCrossing and Vault work, both track andmachinery, for the Third Avenue CableRoad, now under construction..

. The Street railway journal . At 138th St. crossing of the N. Y.Central R. R. in N. Y. City, is a gate madeand erected by us 7 years ago. This gateis raised and lowered nearly ever minutein the day, yet it has never been out oforder in that time nor cost anythingfor repairs. WE BUILT COMPLETE, READYFOR OPERATION, THE CABLE ROADTHROUGH 125th STREET, FROMRIVER TO RIVER, IN NEW YORKCITY. Pivotal Elevating Mechanism at 125th St. and Third Ave., N. Y. We also built a portion of the SpecialCrossing and Vault work, both track andmachinery, for the Third Avenue CableRoad, now under construction.. Stock Photo
Preview

Image details

Contributor:

Reading Room 2020 / Alamy Stock Photo

Image ID:

2CR7B0D

File size:

7.2 MB (297.7 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

2931 x 853 px | 24.8 x 7.2 cm | 9.8 x 2.8 inches | 300dpi

More information:

This image could have imperfections as it’s either historical or reportage.