London, UK. 13 April 2018. Workers prepare to install the retractable roof over Court One at the All England Tennis Club which will be ready for the 2019 Wimbledon tennis championships and which will increase seating capacity and transform the grass court arena capable of guaranteeing play in all weather conditions. Credit: amer ghazzal/Alamy Live News
RMID:Image ID:MC4DC0
Image details
Contributor:
amer ghazzal / Alamy Stock PhotoImage ID:
MC4DC0File size:
20.4 MB (453.1 KB Compressed download)Releases:
Model - no | Property - noDo I need a release?Dimensions:
3267 x 2178 px | 27.7 x 18.4 cm | 10.9 x 7.3 inches | 300dpiDate taken:
13 April 2018Location:
LondonMore information:
This image could have imperfections as it’s either historical or reportage.