Mainz, Germany. 28th Jan, 2021. The section for the new Schierstein bridge is being brought into position by a pontoon ship. From the ship, the 2,000-tonne, 120-metre-long component will be hoisted into its final position using steel cables. Credit: Andreas Arnold/dpa/Alamy Live News

Mainz, Germany. 28th Jan, 2021. The section for the new Schierstein bridge is being brought into position by a pontoon ship. From the ship, the 2,000-tonne, 120-metre-long component will be hoisted into its final position using steel cables. Credit: Andreas Arnold/dpa/Alamy Live News Stock Photo
Preview

Image details

Contributor:

dpa picture alliance / Alamy Stock Photo

Image ID:

2E5KGPF

File size:

52.1 MB (2.8 MB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

5625 x 3239 px | 47.6 x 27.4 cm | 18.8 x 10.8 inches | 300dpi

Date taken:

28 January 2021

Photographer:

dpa

More information:

This image could have imperfections as it’s either historical or reportage.

Available for editorial and personal use only. Get in touch for commercial uses.

Search stock photos by tags