Russia. 21st Aug, 2018. Before pipelaying could start, the Castoro Sei pipelay vessel was retrofitted at the Port of Rotterdam in February 2010. A new welding system and heavy-duty tensioners that hold the pipeline in position were installed, as well as stinger - the external ramp which will provide support to the pipeline when it is slowly released. Credit: Nord Stream Ag/Russian Look/ZUMA Wire/Alamy Live News

Russia. 21st Aug, 2018. Before pipelaying could start, the Castoro Sei pipelay vessel was retrofitted at the Port of Rotterdam in February 2010. A new welding system and heavy-duty tensioners that hold the pipeline in position were installed, as well as stinger - the external ramp which will provide support to the pipeline when it is slowly released. Credit: Nord Stream Ag/Russian Look/ZUMA Wire/Alamy Live News Stock Photo
Preview

Image details

Contributor:

ZUMA Press, Inc. / Alamy Stock Photo

Image ID:

PFCENB

File size:

23.9 MB (756.9 KB Compressed download)

Releases:

Model - no | Property - noDo I need a release?

Dimensions:

3543 x 2362 px | 30 x 20 cm | 11.8 x 7.9 inches | 300dpi

Date taken:

21 August 2018

Photographer:

ZUMA Press

More information:

This image could have imperfections as it’s either historical or reportage.

Available for editorial and personal use only. Get in touch for commercial uses.